PRESENTATION TRANSCRIPT:
Nexsan and FalconStor have formed a strategic venture to deliver an integrated system designed to optimize almost any backup environment and deliver immediate ROI. Read this presentation transcript to find out how you can minimize reliance on tape, reduce storage consumption and improve operational efficiency.
WHITE PAPER:
The System x eX5 family provides not only the performance, but also the flexibility necessary to address businesses most pressing needs: Performance and cost savings, all in one package. This white paper shows how listening to customers priorities helped the IBM System x team achieve their goal.
IT BRIEFING:
By replacing aging single-core processor-based servers with new, more energy-efficient servers, you can gain capacity to grow and to increase IT performance using fewer servers. The estimated cost savings from energy and other operating cost efficiencies can pay for new servers in a an estimated 8 months.
DATA SHEET:
The Dell PowerEdge R815 is a 4-socket rack server offering the latest AMD Opteron processors with up to 48 processor cores and an excellent balance of advanced manageability, memory scalability, I/O, and redundancy in a space-saving 2U form factor.
EGUIDE:
From power distribution outlets to available network connectivity, server deployment can be an arduous process. Explore ten considerations that should be factored into every rack-and-stack server deployment checklist and learn the differences between converged infrastructures and disaggregated servers.
PRODUCT LITERATURE:
Read this article to learn how to simplify your traditional UNIX, IBM i and Linux rack-mount and tower setup with the IBM BladeCenter JS12 Express blade and BladeCenter S chassis. Discover how it delivers a complete integrated business system.
EGUIDE:
What decisions go into building a modern data center? This e-guide discusses the data center design decisions. Inside, you will find discussions on three interface options for remote server monitoring and management, and the differences between blade and rack servers.
EGUIDE:
From power distribution outlets to available network connectivity, server deployment can be a difficult process. Explore ten considerations that should be factored into every rack-and-stack server deployment checklist.
WHITE PAPER:
This resource discusses an advanced policy power management reference architecture that can significantly improve power efficiency in your data center, helping you to achieve real-time server power monitoring, power optimized workloads and much more.
WHITE PAPER:
Enterprises of all sizes are deploying or considering deploying blade systems as a way to consolidate resources and lower their total cost of ownership. Read this white paper to learn about the total cost of ownership (TCO) for the Dell PowerEdge servers.